Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | connect2, segregation |
Date time: | 9.55am, Sunday 7th October, 2012 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Under construction cycle track on Waterloo Street, part of Connect2 project (see also #46668)
Comments reflect the views of the original submitter only.